Key Information

Register
Submit
The challenge is finished.

Challenge Overview

Project Overview

Client is a fortune 500 industrial gas company that operates chemical manufacturing facilities throughout the world.  From time to time we need to make changes to the different aspects of the manufacturing processes at these facilities.  As you can imagine it is very important that these changes be managed through a very disciplined approach and enforce certain business rules because mistakes in the Management of Change process could have catastrophic effects.   These changes could be as simple as updating a site specific operating procedure to a adding addition equipment such as compressors, pumps or electrical components.  The more complex the change, (Level 1 change is the highest) the greater amount of additional actions and contributor’s (people) that will be involved in the change process.  We currently are working with a paper process and are looking to change to a web based application that will allow us to enforce business rules and eventually conduct some data mining to understand how we can make this process better.

Competition Task Overview

For this challenge, we need to fix some admin related bugs and add some new admin related features.

Please register to check the issues list from challenge forum.

Coding Standards

Please follow the coding standards provided by the client.

Testing

Existing unit tests must NOT be broken after this challenge.

Winner Responsibility

Winner will be asked to help with code merge and deploy the final submission on a VM.

Technology Overview

  • C#
  • .NET Framework 4.0
  • WCF
  • Visual Studio 2012
  • SQL Server 2012
  • Windows Server 2012
  • RESTful
  • IIS 7
  • ASP.NET MVC 4

Documentation Provided

Please register to download documents from challenge forum.



Final Submission Guidelines

Submission Deliverables

A complete list of deliverables can be viewed in the TopCoder Assembly competition Tutorial at: http://apps.topcoder.com/wiki/display/tc/Assembly+Competition+Tutorials 

Below is an overview of the deliverables:

  • Fully implemented code that covers all requirements.
  • A complete and detailed deployment documented explaining how to deploy the application including configuration information.

Submission Guidelines

For each member, the final submission should be uploaded via the challenge detail page on topcoder.com.

ELIGIBLE EVENTS:

2016 TopCoder(R) Open

REVIEW STYLE:

Final Review:

Community Review Board

Approval:

User Sign-Off

SHARE:

ID: 30049420